NEC 125% Continuous Load Rule

NEC overcurrent device and conductor sizing for continuous vs non-continuous loads — the 125% rule explained with examples.

Formulas

OCPD ≥ 1.25 × I_continuous + 1.0 × I_non-continuous

Minimum overcurrent device rating

Conductor ≥ 1.25 × I_continuous + 1.0 × I_non-continuous

Minimum conductor ampacity

Variable Definitions

OCPD=Overcurrent protective device rating(amperes (A))
I_continuous=Continuous load current (3+ hours)(amperes (A))
I_non-continuous=Non-continuous load current(amperes (A))
1.25=Continuous load multiplier(dimensionless)

Worked Example

Circuit with 30A continuous lighting load and 10A non-continuous receptacle load.

  1. OCPD = (1.25 × 30) + (1.0 × 10) = 37.5 + 10 = 47.5A
  2. Next standard breaker: 50A
  3. Conductor: minimum 47.5A ampacity → 6 AWG copper (65A at 75°C)

Answer: 50A breaker with 6 AWG copper conductors

When to Use

  • Sizing branch circuit breakers for lighting circuits (always continuous)
  • Sizing feeders with mixed continuous and non-continuous loads
  • HVAC equipment circuit sizing
  • Any load operating for 3 hours or more continuously

Standards & References

  • NEC 210.19(A) — Branch Circuit Conductor Sizing
  • NEC 210.20(A) — Branch Circuit OCPD Sizing
  • NEC 215.2(A) — Feeder Sizing
  • NEC Article 100 — Definition of 'Continuous Load'