Real-World Scenarios
Step-by-step calculation walkthroughs — 13 real-world electrical design problems solved from start to finish.
Residential
Home electrical design and service calculations
Sizing a 200A Residential Service
Walk through a complete NEC 220.82 (optional method) residential service calculation for a typical 2,500 sq ft single-family home with central A/C, electric range, dryer, and water heater.
Wiring a Detached Garage: 60A Subpanel
Size and install a 60A, 240V feeder from the main panel to a detached garage 85 feet away. The garage will have general lighting, receptacles, and a future EV charger circuit.
Installing a Level 2 EV Charger (48A)
Install a 48A hardwired Level 2 EVSE (Tesla Wall Connector) in an attached garage on an existing 200A residential service. Verify panel capacity and size the circuit.
Multi-Family (12-Unit) Service Calculation
Calculate the total building service for a 12-unit apartment complex. Each unit is identical: 1,200 sq ft with electric range, dryer, A/C, and water heater. NEC provides generous demand factors for multi-dwelling buildings.
Commercial
Office, retail, restaurant, and tenant buildout scenarios
Commercial Tenant Buildout: 100A Subpanel
Design the electrical distribution for a 3,000 sq ft commercial office tenant space in an existing building. The landlord provides a 100A, 208Y/120V tap from the building transformer for the tenant panel.
Restaurant Kitchen Load Calculation
Calculate the electrical demand for a full-service restaurant kitchen with commercial cooking equipment, applying NEC Table 220.56 demand factors for commercial kitchen loads.
Parking Lot Lighting Circuit Design
Design the lighting circuits for a 120-space parking lot with LED pole-mounted luminaires. This involves calculating the number of fixtures, sizing circuits for long conduit runs, and addressing voltage drop.
Industrial
Motor control, data center, and heavy power scenarios
Motor Control Center Design (480V)
Design a motor control center (MCC) serving five motors in an industrial facility. Size the feeder, branch circuits, overloads, and SCGF protection per NEC 430.
Fire Pump Circuit Design (NEC 695)
Design the electrical supply for a 50 HP electric fire pump in a commercial building. Fire pump circuits have unique NEC requirements that differ significantly from standard motor circuits.
Data Center Power Distribution Design
Design the power distribution for a 200 kW IT load data center with 2N redundancy, including transformer, UPS, and PDU sizing. This is a Tier II facility with a single utility feed and UPS backup.
Renewable & Backup
Solar, battery, and generator system design
10 kW Residential Rooftop Solar Design
Design a 10 kW-DC rooftop solar PV system for a single-family home with a 200A main panel. Includes module layout, string sizing, inverter selection, and interconnection per NEC 690 and 705.
Generator & Automatic Transfer Switch Installation
Install a 100 kW natural gas standby generator with an automatic transfer switch (ATS) for a small commercial building, covering emergency, legally required standby, and optional standby loads.
Whole-Home Battery Backup System Design
Design a whole-home battery backup system (e.g., Tesla Powerwall, Enphase IQ Battery) for a 200A residential service. The system will provide backup during grid outages and pair with an existing 10 kW solar PV system.