Continuous Load and the 125 Percent Rule
- Code basis
- 210.19 / 210.20 / 215.2
- Multiplier
- 125% continuous
- Applies to
- Conductor & OCPD sizing
- Does not replace
- Voltage-drop current
The Procedure
5 steps, in the order the code applies them.
Step 1
Decide if the load is continuous
A load expected to run for three hours or more at maximum current is continuous. EVSE and many water heaters are the usual examples.
Step 2
Split continuous and non-continuous portions
Only the continuous portion gets 125 percent. Add non-continuous load at 100 percent.
Step 3
Size conductors to the design current
The conductor must carry the 125 percent continuous plus 100 percent non-continuous total after derating and termination caps.
Step 4
Size the overcurrent device to the same design current
Pick a standard breaker at or above that design current, then confirm the conductor can be protected by it.
Step 5
Keep operating current for voltage drop
When checking drop, enter the current that flows — not the 125 percent sizing number — unless the sustained load truly equals that value.
Sizing current is not measured current
Continuous load is taken at 125 percent for conductor and overcurrent sizing.
Voltage drop still follows the current that actually flows, so the two checks should not reuse the same adjusted number blindly.
Mixed loads
Apply 125 percent only to the continuous portion, then add non-continuous load at 100 percent.
The calculator exposes this as a flag for simple cases; complex panels need itemized load work.
Decision Guide
The choices that change the answer, and how to make them.
EVSE is the teaching example
48 A continuous charge current needs a 60 A circuit. That single identity prevents most continuous-load mistakes.
Do not 125 percent a whole panel by habit
Apply the multiplier to continuous portions. Inflating every line item produces an oversized fantasy service.
Nameplate instructions can redefine the input
Some equipment states minimum circuit ampacity already including continuous treatment. Do not double-apply 125 percent on top of MCA.
FAQs
What loads are considered continuous?
Does the 125 percent rule change voltage drop?
How do I size a mixed continuous and non-continuous load?
Calculated against the NEC 2023 edition using 210.19(A)(1), 210.20(A), 215.2(A)(1). Confirm the edition adopted by your AHJ, which may differ and may carry local amendments.
Not covered by this tool
- Motor, air-conditioning and welder circuits, which are sized under their own articles.
- Conductors in free air and photovoltaic circuits.
- Parallel conductor sets, taps and busbars.
- Local amendments, which can be stricter than the published code.