What Size Wire for 100 Amps?
- Load
- 100 A
- Distance
- 0 ft entered
- Band
- Feeder / subpanel
- Defaults
- Non-continuous, 75 C lugs, 86 F, 240 V single-phase
- Conductor count
- 3 current-carrying
Computed Starting Point
The table uses common defaults. Change the calculator inputs for the actual installation.
| Material | Computed size | OCPD | Usable ampacity | Governing constraint | Default check |
|---|---|---|---|---|---|
| Copper | 3 AWG | 100 A | 100 A | Termination rated 75 C | Passes defaults |
| Aluminum | 1 AWG | 100 A | 100 A | Termination rated 75 C | Passes defaults |
What 100 A ChangesAt 100 A, the conductor answer depends heavily on the equipment and load calculation. The page result is a 75 C default, but equipment rated 100 A or less is often treated as 60 C unless marked otherwise, and the feeder or service load calculation must justify the 100 A rating before wire is selected.
Adjacent Amp Ratings
See whether stepping one standard size up or down forces a conductor jump under the same defaults.
| Load | Copper size | Copper OCPD | Aluminum size | Aluminum OCPD |
|---|---|---|---|---|
| 90 A | 3 AWG | 90 A | 2 AWG | 90 A |
| 100 A (this page) | 3 AWG | 100 A | 1 AWG | 100 A |
| 110 A | 2 AWG | 110 A | 1/0 AWG | 110 A |
A plateau means neighboring amp ratings share a conductor size under these defaults. A jump means a standard breaker change often needs a larger wire; confirm with your real ambient, length and terminations.
100 A Is the Common Feeder Boundary
Feeder / subpanel context for a 100 A circuit.
A 100 A wire-size search is often a garage subpanel, shop feeder, ADU feeder, service-equipment conversation, or a panel-capacity question after adding EVSE or electric appliances.
Under the displayed 75 C termination defaults, copper stays 3 AWG from 90 A to 100 A, while aluminum moves from 2 AWG to 1 AWG. The next 110 A page moves both materials larger, so 100 A is a real decision point rather than just another row.
What Changes This Answer
Checks that can change the starting conductor under the displayed defaults.
Check 60 C equipment before ordering
The direct answer assumes 75 C terminations. If 100 A equipment must be treated at 60 C, the displayed 3 AWG copper and 1 AWG aluminum answer can move larger.
Load calculation owns the rating
A 100 A conductor answer assumes 100 A is the correct feeder or service rating. Run the dwelling, feeder, or equipment load calculation first.
Do not miss the aluminum jump
Under these defaults, 90 A aluminum is 2 AWG, while 100 A aluminum moves to 1 AWG.
Compare 110 A before upsizing
The adjacent 110 A page moves copper to 2 AWG and aluminum to 1/0 AWG. Do not change the planned rating without load and equipment support.