What Size Wire for 125 Amps?
- Load
- 125 A
- Distance
- 0 ft entered
- Band
- Feeder / subpanel
- Defaults
- Non-continuous, 75 C lugs, 86 F, 240 V single-phase
- Conductor count
- 3 current-carrying
Computed Starting Point
The table uses common defaults. Change the calculator inputs for the actual installation.
| Material | Computed size | OCPD | Usable ampacity | Governing constraint | Default check |
|---|---|---|---|---|---|
| Copper | 1 AWG | 125 A | 130 A | Termination rated 75 C | Passes defaults |
| Aluminum | 2/0 AWG | 125 A | 135 A | Termination rated 75 C | Passes defaults |
What 125 A ChangesAt 125 A, the conductor answer assumes a full 125 A feeder, not merely a panel that happens to have a 125 A bus. A 125 A subpanel can be fed at a smaller breaker when the calculated load and installation allow it, but this page shows the full 125 A conductor starting point.
Adjacent Amp Ratings
See whether stepping one standard size up or down forces a conductor jump under the same defaults.
| Load | Copper size | Copper OCPD | Aluminum size | Aluminum OCPD |
|---|---|---|---|---|
| 110 A | 2 AWG | 110 A | 1/0 AWG | 110 A |
| 125 A (this page) | 1 AWG | 125 A | 2/0 AWG | 125 A |
| 150 A | 1/0 AWG | 150 A | 3/0 AWG | 150 A |
A plateau means neighboring amp ratings share a conductor size under these defaults. A jump means a standard breaker change often needs a larger wire; confirm with your real ambient, length and terminations.
125 A Is the Subpanel Bus-Rating Check
Feeder / subpanel context for a 125 A circuit.
A 125 A wire-size search often comes from a subpanel label, garage panel, shop feeder, ADU feeder, or panel bus rating. The key question is whether the feeder is actually protected and loaded at 125 A, or whether a smaller feeder breaker is serving a panel with a larger bus rating.
Under the displayed 75 C termination defaults, copper moves from 2 AWG at 110 A to 1 AWG here, and aluminum moves from 1/0 AWG to 2/0 AWG. The next 150 A page moves both materials again and changes into the service / large-feeder band.
What Changes This Answer
Checks that can change the starting conductor under the displayed defaults.
Separate bus rating from feeder rating
A panel bus label is a maximum equipment rating, not proof that the feeder must be 125 A. Size the conductors to the feeder overcurrent device and calculated load.
Do not reuse 110 A conductors
Under these defaults, 110 A uses 2 AWG copper and 1/0 AWG aluminum. This 125 A page moves to 1 AWG copper and 2/0 AWG aluminum.
Load calculation before full capacity
A full 125 A feeder should be justified by the dwelling, feeder, or equipment load calculation before the conductor is selected.
Check 60 C equipment limits
The direct answer assumes 75 C terminations. For a full 125 A feeder, equipment limited to 60 C will force larger conductors than the displayed defaults.
Use distance for detached feeders
Garage, shop, and ADU feeders can become voltage-drop governed on long runs. Enter the actual one-way route length before ordering wire.