What Size Wire for 200 Amps?
- Load
- 200 A
- Distance
- 0 ft entered
- Band
- Service / large feeder
- Defaults
- Non-continuous, 75 C lugs, 86 F, 240 V single-phase
- Conductor count
- 3 current-carrying
Computed Starting Point
The table uses common defaults. Change the calculator inputs for the actual installation.
| Material | Computed size | OCPD | Usable ampacity | Governing constraint | Default check |
|---|---|---|---|---|---|
| Copper | 3/0 AWG | 200 A | 200 A | Termination rated 75 C | Passes defaults |
| Aluminum | 250 kcmil | 200 A | 205 A | Termination rated 75 C | Passes defaults |
What 200 A ChangesAt 200 A, the displayed copper row has no extra ampacity above the 200 A rating under 75 C defaults, and aluminum shows only 205 A. Equipment limited to 60 C will force larger conductors, while service-entrance product listings, meter and disconnect lugs, utility standards, and AHJ review can change the allowed conductor.
Adjacent Amp Ratings
See whether stepping one standard size up or down forces a conductor jump under the same defaults.
| Load | Copper size | Copper OCPD | Aluminum size | Aluminum OCPD |
|---|---|---|---|---|
| 175 A | 2/0 AWG | 175 A | 4/0 AWG | 175 A |
| 200 A (this page) | 3/0 AWG | 200 A | 250 kcmil | 200 A |
| 225 A | 4/0 AWG | 225 A | 300 kcmil | 225 A |
A plateau means neighboring amp ratings share a conductor size under these defaults. A jump means a standard breaker change often needs a larger wire; confirm with your real ambient, length and terminations.
200 A Is the Common Service Rating Check
Service / large feeder context for a 200 A circuit.
A 200 A wire-size search is often a residential service upgrade, meter-main replacement, large subpanel, detached shop feeder, or panel-capacity plan. Because 200 A is a familiar service size, it is easy to skip the harder question: whether the calculated load, service equipment, and utility rules actually support that rating.
Under the displayed 75 C termination defaults, copper moves from 2/0 AWG at 175 A to 3/0 AWG here, while aluminum moves from 4/0 AWG to 250 kcmil. The next 225 A page moves both materials again, so 200 A is a real equipment boundary rather than a generic large-feeder label.
What Changes This Answer
Checks that can change the starting conductor under the displayed defaults.
Load calculation before service upgrade
A 200 A conductor answer assumes 200 A is the correct service or feeder rating. Confirm the dwelling, feeder, or equipment load calculation before selecting wire.
Confirm the conductor product
Service-entrance cable, raceway conductors, and feeder cable assemblies can follow different product listings and termination limits. Match the result to the actual product.
Check 60 C equipment limits
The displayed 3/0 AWG copper and 250 kcmil aluminum results are 75 C defaults. Equipment limited to 60 C will force larger conductors for a full 200 A feeder or service.
Do not reuse 175 A conductors
Under these defaults, 175 A uses 2/0 AWG copper and 4/0 AWG aluminum. This 200 A page moves to 3/0 AWG copper and 250 kcmil aluminum.
Coordinate utility and AHJ requirements