What Size Wire for 350 Amps?
- Load
- 350 A
- Distance
- 0 ft entered
- Band
- Large service / feeder
- Defaults
- Non-continuous, 75 C lugs, 86 F, 240 V single-phase
- Conductor count
- 3 current-carrying
Computed Starting Point
The table uses common defaults. Change the calculator inputs for the actual installation.
| Material | Computed size | OCPD | Usable ampacity | Governing constraint | Default check |
|---|---|---|---|---|---|
| Copper | 500 kcmil | 350 A | 380 A | Termination rated 75 C | Passes defaults |
| Aluminum | 700 kcmil | 350 A | 375 A | Termination rated 75 C | Passes defaults |
What 350 A ChangesAt 350 A, copper shows 380 A usable ampacity and aluminum shows 375 A under the displayed 75 C defaults. The margin is larger than 300 A, but 60 C equipment, derating, product listings, long runs, lug range, and raceway limits can still change the final design.
Adjacent Amp Ratings
See whether stepping one standard size up or down forces a conductor jump under the same defaults.
| Load | Copper size | Copper OCPD | Aluminum size | Aluminum OCPD |
|---|---|---|---|---|
| 300 A | 350 kcmil | 300 A | 500 kcmil | 300 A |
| 350 A (this page) | 500 kcmil | 350 A | 700 kcmil | 350 A |
| 400 A | 600 kcmil | 400 A | 900 kcmil | 400 A |
A plateau means neighboring amp ratings share a conductor size under these defaults. A jump means a standard breaker change often needs a larger wire; confirm with your real ambient, length and terminations.
350 A Is the Large-Feeder Practicality Check
Large service / feeder context for a 350 A circuit.
A 350 A wire-size search usually means the design is already in large service, building feeder, or light commercial territory. At this size, a single-conductor answer may be electrically valid while still pushing lug range, enclosure bending space, raceway fill, pulling tension, and material handling.
Under the displayed 75 C termination defaults, copper moves from 350 kcmil at 300 A to 500 kcmil here, and aluminum moves from 500 kcmil to 700 kcmil. The next 400 A page moves copper to 600 kcmil and aluminum to 900 kcmil, so 350 A is a real decision point before 400 A equipment.
What Changes This Answer
Checks that can change the starting conductor under the displayed defaults.
Do not reuse 300 A conductors
Under these defaults, 300 A uses 350 kcmil copper and 500 kcmil aluminum. This 350 A page moves to 500 kcmil copper and 700 kcmil aluminum.
Compare 400 A before standardizing
The adjacent 400 A page moves copper to 600 kcmil and aluminum to 900 kcmil under the same defaults. Do not drift to 400 A without load, equipment, and utility support.
Confirm lug and enclosure limits
Equipment lug range, conductor bending space, gutter size, and raceway entry layout can decide whether the single-conductor result is buildable.
Treat parallel sets as a separate design
Parallel conductors may be practical at this scale, but this page does not size parallel sets. Use matching conductors, equal lengths, listed terminations, and project-specific engineering.
Check 60 C and derating cases
The displayed 500 kcmil copper and 700 kcmil aluminum results are 75 C defaults. Equipment limited to 60 C, hot ambient, bundling, or long feeders can force a different result.