What Size Wire for 100 Amps at 400 Feet?
- Load
- 100 A
- Distance
- 400 ft
- Band
- 100 A feeder
- Defaults
- Non-continuous, 75 C lugs, 86 F, 240 V single-phase
Computed Starting Point
Ampacity and voltage drop under common defaults for this amp and distance.
| Material | Computed size | OCPD | Usable ampacity | Governing constraint | Default check |
|---|---|---|---|---|---|
| Copper | 3/0 AWG | 100 A | 200 A | Voltage drop | Passes defaults |
| Aluminum | 250 kcmil | 100 A | 205 A | Voltage drop | Passes defaults |
What 400 ft ChangesAt 400 ft, voltage drop dominates the page result and pushes the default answer to 3/0 copper or 250 kcmil aluminum. The next best engineering move may be a different equipment location, a different load assumption, or a project-specific design review rather than blindly accepting a very large conductor.
Zero-Length vs This Distance
If the distance-adjusted size is larger, voltage drop governed under these defaults.
| Case | Copper size | Copper constraint | Aluminum size | Aluminum constraint |
|---|---|---|---|---|
| Ampacity only (0 ft) | 3 AWG | Termination rated 75 C | 1 AWG | Termination rated 75 C |
| 400 ft (this page) | 3/0 AWG | Voltage drop | 250 kcmil | Voltage drop |
Adjacent Distances at This Amp
Neighboring published lengths for 100 A under the same defaults.
| Distance | Copper size | Aluminum size | Copper constraint |
|---|---|---|---|
| 300 ft | 2/0 AWG | 4/0 AWG | Voltage drop |
| 400 ft (this page) | 3/0 AWG | 250 kcmil | Voltage drop |
400 ft Is an Extreme 100 A Feeder Run
100 A feeder context for 100 A at 400 ft.
A 400 ft 100 A run is usually a remote shop, barn, pump location, gate equipment, detached structure or long site feeder. At this distance, the conductor answer is tied to civil layout and equipment placement, not just an electrical table lookup.
The default result has moved far from the zero-length 100 A conductor. This page should make the user pause before buying: confirm the real load, route, voltage and whether carrying 100 A the whole way is still the right design.
What Changes This Long-Run Answer
Checks that matter for distance-governed sizing in this amp band.
Reconfirm the full 100 A load
If the actual design load is well below 100 A, the voltage-drop result can change substantially. Do not size from the feeder rating if the sustained load is lower.
Review the route before ordering
At 400 ft, trench changes, extra sweeps and verticals are expensive. Lock the measured one-way path before committing to conductor.
Check raceway, bends and lugs as a package
3/0 copper and 250 kcmil aluminum need equipment that accepts the size and a raceway path that can be pulled and terminated cleanly.
Escalate unusual site conditions