What Size Wire for 200 Amps at 150 Feet?
- Load
- 200 A
- Distance
- 150 ft
- Band
- 200 A feeder / service
- Defaults
- Non-continuous, 75 C lugs, 86 F, 240 V single-phase
Computed Starting Point
Ampacity and voltage drop under common defaults for this amp and distance.
| Material | Computed size | OCPD | Usable ampacity | Governing constraint | Default check |
|---|---|---|---|---|---|
| Copper | 3/0 AWG | 200 A | 200 A | Termination rated 75 C | Passes defaults |
| Aluminum | 250 kcmil | 200 A | 205 A | Termination rated 75 C | Passes defaults |
What 150 ft ChangesAt 150 ft, the conductor size has not changed under the default 200 A model, but the margin is no longer casual. Field measurement, underground routing, service-equipment placement and product selection deserve more attention than another ampacity chart lookup.
Zero-Length vs This Distance
If the distance-adjusted size is larger, voltage drop governed under these defaults.
| Case | Copper size | Copper constraint | Aluminum size | Aluminum constraint |
|---|---|---|---|---|
| Ampacity only (0 ft) | 3/0 AWG | Termination rated 75 C | 250 kcmil | Termination rated 75 C |
| 150 ft (this page) | 3/0 AWG | Termination rated 75 C | 250 kcmil | Termination rated 75 C |
Adjacent Distances at This Amp
Neighboring published lengths for 200 A under the same defaults.
| Distance | Copper size | Aluminum size | Copper constraint |
|---|---|---|---|
| 100 ft | 3/0 AWG | 250 kcmil | Termination rated 75 C |
| 150 ft (this page) | 3/0 AWG | 250 kcmil | Termination rated 75 C |
| 200 ft | 3/0 AWG | 250 kcmil | Termination rated 75 C |
150 ft Is the Measurement Buffer
200 A feeder / service context for 200 A at 150 ft.
A 150 ft 200 A search often starts as a panel relocation, barn or shop feeder, or service lateral that looked comfortably short on the site plan. The real question is whether the measured conductor path still belongs on the short-run platform.
Under the defaults, 150 ft has the same conductor result as 100 ft and 200 ft. That sameness is useful: the page marks a plateau, while warning that detours and risers can push the job toward the 250 ft jump.
What Changes This Long-Run Answer
Checks that matter for distance-governed sizing in this amp band.
Measure the conductor path
Count sweeps, risers, wall offsets and equipment placement. A nominal 150 ft route can grow enough to make the adjacent distance pages matter.
Keep product family explicit
SER, URD-style assemblies and individual THHN/XHHW conductors in raceway do not always share the same usable assumptions. Match the result to the installed product.
Check the 250 ft jump early
The 200 ft page still stays on the same platform under these defaults, but the 250 ft page upsizes for voltage drop. Compare before final trench layout.
Do not oversell voltage drop
The default result is still termination-governed here. Treat drop as a checked constraint, not the reason to upsize at 150 ft under these assumptions.